06 — Existing facilities

Bring legacy alarm and suppression up to current expectation

Operating buildings often still run conventional panels, obsolete clean agents, or systems that no longer match occupancy or Civil Defense practice. Bessel upgrades detection, panels, pumps, and suppression while the facility stays in use.

Typical work converts conventional alarm to addressable architecture, replaces detectors and notification, and integrates fire with CCTV, BMS, and public-address so security and facilities see one event, not three.

Legacy suppression is reviewed for agent availability and environmental rules. Where the original gas is no longer acceptable we re-engineer to eco-safe agents without pretending the old cylinders can simply be refilled forever.

Fire system upgrade works

Typical applications

Upgrades are for buildings that must remain occupied and insurable while life-safety plant is replaced.

  • Hotels, offices, and campuses on conventional fire alarm
  • Industrial sites needing BMS, CCTV, and PA integration
  • Facilities with obsolete suppression agents or non-addressable detection
  • Change-of-use renovations that trigger a new Civil Defense review

Detailed scope of work

Survey first, then a written gap list against the current occupancy and authority expectation.

Alarm modernisation

  • Panel, detector, and notification replacement
  • Conversion to addressable fire alarm
  • Cause-and-effect rewrite and re-commissioning

Integration & agents

  • Interface to CCTV, BMS, and PA
  • Pump and riser upgrades where hydraulics are inadequate
  • Replacement of legacy suppression with eco-safe agents
  • Isolation plans and temporary cover during the works

Standards, method & records

We do not strip the old system until temporary detection or a documented cover plan is in place. Phasing is agreed with the operator and, where required, the authority.

As-built information for the existing system is often missing. We survey, label, and produce a new record so the next maintenance contractor is not guessing loop topology.

What you receive

  • Gap assessment against current occupancy
  • Phased isolation and cover plan
  • New cause-and-effect and as-builts
  • Commissioning records for the upgraded system

Related services

Request this package